Project Scope
Located 27km from the coast of Angus in the North Sea, the Seagreen Offshore Wind Farm is Scotland’s largest, and the worlds deepest fixed bottom offshore wind farm, with 114 wind turbines and the capacity to deliver 1.1GW of clean, renewable energy.The installation project started at Global Energy Group’s Port of Nigg facility near Inverness, and was completed in October 2023. A project of significant scale – the outcome was 114 Vesta 10MW turbines, mounted on giant steel superstructures over 100m above the waves, combining to provide enough green energy to power more than 1.6 million homes, making a significant contribution to Scotland’s net zero ambitions. Global Energy Group’s.
Port of Nigg
Port of Nigg facility served as the main location for offloading, storage, and mobilisation on the project. As the pre-assembly and marshalling facility for the Wind Turbine Generators, the major components were delivered, assembled, and tested onsite, with TPS welding equipment used in the mobilisation and demobilisation of the huge jacket foundations, the massive 2,000t steel superstructures that are anchored into the seabed to support the Wind Turbines.





